That was a overnighter to a mates place near Lismore.
He has a hydraulic splitter that connects to the PTO on one of his tractors
That was 60 mins work tops
Including loading into trailer
I would post a video of it if I knew how too ;(
Sent from my SM-S901E using Tapatalk