I think the biggest PITA with setting mine up is having to get all (most anyway) the stuff out of the tub first then storing it somewhere off to the side until the tent is setup and then moving it where it needs to be. Double handling
The actual tent setup and the awning is probably a 1/2hour job on it's own but as said by the time I get all the crap out, setup the tent, pull a tarp over the top (convinced that this is the way to go for temp control etc), move all the stuff to where we want it, set up the shower (including the Hottap
) etc makes the whole task go to about 21/2 hours from pull up to
Would reckon that the Forward Folds would improve most of this