I had a carport added to my shed. Shed was 9x6, now has a 6x6 carport out the front and a 15m carport down the side.
I want to sheet some of it in, so today I struck a blow for the next phase of construction and started laying a concrete slab. So far I've done 2.5 x 3m, 100mm thick and I'm a broken man.
Its all been shoveled and mixed in my little electric mixer, 35L at a time, so approximately 21 mixer loads and having to shovel 1/2m3 of gravel out of the ute before I started as I needed a cubic meter, but can only really carry 1/2m at a time, as well as the 20 bags of cement I stocked up with.
Only 12.5m to go. Makes the $9.5k quote I got to do it all sound reasonable now.
I hope I don't have to lift anything heavy at work tomorrow as a pen will probably be testing my capabilities