Finally finished in the shed this arvo...just as well...back to work in the morning.
Installed shelving for excess timber
Reinstalled dart board after too long.
Built a new matching work bench to extent the existing one. Made room for the old ice box to fit in the side of the bench.
Removed faulty twin fluro and installed 2 separate units to spread the light a bit more...
Vacuumed the whole shed down to remove all the dust build up...four 60litre shop vac loads of dust emptied out...lol
Pics don't justify the amount of work that went into getting the cave back into working order after 8 years or dormancy.
After this weekend its been suggested I move in there...suggestion noted and under consideration...so far the pros outweigh the cons...lol
Hope your all keeping sane...hopefully we can all get back onto our swags soon.enough.
We're all ere coz we ain't all there.